Some Mo’ Pics

Here some of the updated pics as of today, shows the outside almost done.  The interior is still being painted and some electric and plumbing needs to be finished.  The floor tiling is done and the outside is getting insulated.  Another week or two should do it. The first two pics show the hole dug by the bulldozer, now bricked in.  This will be a bio-degradeable septic tank (and no, it will not stink) and will take care of itself.

    

Leave a Reply