Updating some older stuff

So, back to the updating of the website.  I am showing things done 6 months ago, we are living in the main house now, even though some of the renovations are not finished.  Mainly the bedroom built-in closet needs completion and the outside terraces need tiling, should get done this year. My work has slowed down massively, as I need a hip replacement and I just cannot do all the work I intended on doing.  So everything is going really slow, some days I can work 8 hours, some days not at all.  I am still trying to fix this with an alternative method, just dont feel like having my leg cut off!

So back to the pics and videos, on the website there is a video showing another palm tree movement, link is palm tree move.

Also, the roof for the bath and bedroom add-on was not done correctly, I ended up firing the team. Got 2 guys to help me, and we redid the roofing, this time correctly.  And we did the drainage also, more ditch digging!

And here some pics:

 

Fixing water drainage
before painting
bathroom has floor heating
Took off the roofing and repaired the leaks.

New entrance gate, fully automated
Another day at the beach