Above the kitchen add-on we had decided to make an outside terrace, accessible from the upstairs balcony door. After starting, we decided to expand it all the way around the house and had to remove the existing roofing, and redo the floor. Made everything waterproof, non-slip tiling and water pipes installed if it rains, going down into the drainage system built around the house.





Thanks for your blog, nice to read. Do not stop.