Work already done…

Most of this work has been done for a couple of weeks now, but I am just getting around to posting this, lazy me.  The ditches they were dug in the previous blog are now filled, the electric outside, new water pipes to the main house are finished, 3 more windows installed.  I can now switch both houses to city water or borehole water at any time, the water tank is filled from the borehole pump automatically when the set level is reached, saves me lots of time, was doing it manual before.  Still just doing these odd jobs, not ready to start on building the extra rooms and finishing the main house, that may take a while.

Before
During
During
finished

Leave a Reply